Can't change order of songs in playlist.
apple Verified ·
Imported from the Apple Support Forums via the Wayback Machine 🔗
For some reason, in iTunes 9.0.2 I can no longer rearrange the order of songs in playlists. (Not smart playlists) Help tells me to click the number column, and to be sure shuffle is off. I did that and still cannot rearrange the order. Also, I cannot drag new songs into a playlist. I can right click on a song and send it to a playlist from the drop down menu, but not drag it there. What the **** is going on? Does anyone have an answer to this? This has got to be a bug.
12 replies
Sign in or join Beachball Help to reply.
- 0
PatrickFitzG ·
Imported from the Apple Support Forums via the Wayback Machine 🔗
You CAN fix it. It was bugging me for a while too.
Go to the first column in the playlist, with the play order in it, and click on the heading section of that column. You will then see a click sort up arrow (toggles to down arrow on next click).
You will also notice that you can now drag and drop the order again.
This is triggered off in the first place when you click sort on another column.
- 0
Jolly Giant ·
Imported from the Apple Support Forums via the Wayback Machine 🔗
RichBP wrote:
For some reason, in iTunes 9.0.2 I can no longer rearrange the order of songs in playlists. (Not smart playlists) Help tells me to click the number column, and to be sure shuffle is off. I did that and still cannot rearrange the order. Also, I cannot drag new songs into a playlist. I can right click on a song and send it to a playlist from the drop down menu, but not drag it there. What the **** is going on? Does anyone have an answer to this? This has got to be a bug. - 0
RichBP ·
Imported from the Apple Support Forums via the Wayback Machine 🔗
Tazzy, my problem went away. I have no idea why. I shut my computer down last night, and when I opened it this morning, iTunes worked the way it should. I frequently just put it to sleep at night, and restart 1 or 2 times during the week. I hadn't shut down for a couple of days, and I guess the restart fixed it.
Worth a try for you. - 0
RichBP ·
Imported from the Apple Support Forums via the Wayback Machine 🔗
Patrick, Clicking in the heading of the song number column had no effect.
Diane: Shuffle was turned off, still not able to rearrange songs.But: see my last posting above. The problem fixed itself the next day when I restarted my computer.
- 0
lonkoenig ·
Imported from the Apple Support Forums via the Wayback Machine 🔗
I'm having the same issue. (Trying to order tunes for a Christmas CD for the car.)
Shuffle is off. Number column is selected for sorting. Rebooting didn't help.
Mac. 10.5This appears to be a new problem.
Oddly, it only appears to be problem for some playlists...
{Shuffles off to check some more possibilities}
Can't pin down the cause, but I have a workaround.1) Select the number sorting column in the main iTunes window
2) Create a new playlist
3) Name and double-click to open the new playlist in a new window
4) Select your problem playlist in the main iTunes window
5) Select All, and drag your tunes to the new playlistJust selecting everything and choosing New Playlist from Selection didn't work for me.
- 0
chillster ·
Imported from the Apple Support Forums via the Wayback Machine 🔗
I had the same exact problem, I had shuffle off and had clicked on the uppermost left column and still wasn't able to change the order of songs on my playlist. I did a computer restart and everything worked just fine. That seems to solve the trick.
- 0
Boris the Loud Listener ·
Imported from the Apple Support Forums via the Wayback Machine 🔗
I had more or less the same mystery as well. I didn't know that turning "Shuffle" off on the bottom of the source panel (left-most panel that shows all the play lists was relevant, but it is. Thanks for the thread and the tips guys.
For those of us who still have the problem even after turning off Shuffle and after a reboot, my sympathy. the next step of things to do after a reboot does not restore good order is usually to check and repair disk permissions, and then to get a Mac service call at the Genius bar - unless you have a support policy in effect.
- 0
RichBP ·
Imported from the Apple Support Forums via the Wayback Machine 🔗
I've done all that. It doesn't work.
- 0
tazzy1973 ·
Imported from the Apple Support Forums via the Wayback Machine 🔗
same here was working fine and now every setting i go to i can right click but not drag. beat me.if i work it out will post. will check with a macgenius i know
- 0
Diane Wordsmith ·
Imported from the Apple Support Forums via the Wayback Machine 🔗
This can be caused by Shuffle being turned on.
- 0
sjpg ·
Imported from the Apple Support Forums via the Wayback Machine 🔗
This was also bugging me.
What worked for me was to to collapse the artwork tab. This makes the tracklist a straight list which can then be dragged and dropped wherever. - 0
Esme27 ·
Imported from the Apple Support Forums via the Wayback Machine 🔗
Even though Shuffle at the bottom of the page was turned off, it wouldn't work for me. I toggled it on and then off again, and then it worked. Weird.