Benches Deployment and MDM

1

New Deployment: Need help but should be fun!

apple Verified

Imported from the Apple Support Forums via the Wayback Machine 🔗

Hi all,

I am about to revamp an existing network, and roll out a new infrastructure and server. Wanted to pick the brains of the gurus here while I am planning. My basic situation is that i am both an individual who wants to provide fun file serving (music and videos) to my entertainment system, and also run a non-profit that does heavy video production. I have enough information about the standards and principles of it all, but the web services side of the equation is new to me.

Right now, I have a Airport Extreme (Gigabit 802.11N), connected to cable modem, serving as DHCP & Router for network, consisting of two 8 port gigabit switches, connected to various entertainment electronics (Tivo, PS3, XBOX, HDDVD, etc), on the computer side, MacPro Nehalem, MacBook Pro 17". Epson Workforce Printer (Wi-Fi), Two Terastation NAS's (1TB & 2TB), Random windows latop. We'll be installing another MacPro in the coming months, expecting to scale to 3 by year end.

Here is what I am looking to do.

1. Run Non-Profit Webserver & Mail Services on internal network & external via VPN, and host external web-site
2. Deploy XSAN for consolidated video storage
3. Run Final Cut Server to enable Digital Assett & project management for video projects (It's what the non-profit does). Ideally linked to the Web side for review and approvals
3. Run a DLNA server to serve up movie and music files to PS3 & XBOX

Here is what I have fresh out of boxes...

1. QLogic Sanbox Fiber Switch 20 port (for XSAN, connected to MacPro Towers, XSERVE, & Storage)
2. Nehalem Xserve (4 Core)
3. XrackPro 2 Hushbox + UPS
4. 48 Port Netgear Smart Switch (using VLANs to carve out metadata network,, if this proves too slow, I will just add another switch for metadata)
5. Apple Xserve RAID ARRAY (7TB USED, yes I know its slow)
6*. Promise RAID E Class 16TB (funding/coming in 1 month)

Now before everyone says go hire a pro, I have to say I like to tinker and figure it out, and I have deployed 2 XSANs already for other projects with no problem. But this is my first time setting up internal network services, and external web services. Plus its fun....

Here are my specific questions, and I am betting they are noob questions so bare with me.

1. Is this too much to put on a single XServe. I normally have two stations working at any given time. I understand how to calculate bandwidth requirements on the XSAN, but I don't know how to take into account the other services. The mail service will support about 6 inboxes, getting about 10-20MB of content a day. But those clients will be iPhone's connected to the calendar, mailbox, and address book services over the air. I will use the current MacPro as a back-up metadata controller. The movie/ audio streaming would be light while the computers are working. Also, I currently have the standard two ports, with one being for XSAN metadata, do you think I need to add a 4 port or larger NIC to the XServe and aggregate the links?

2. How can I set up the server to serve the content from the NASs. Right now each station has to authenticate to the NAS to get its contents. I would like to use the Open Directory Service to allow the network users to automatically have those volumes available to them. When accessing files on the NAS would the flow be (NAS to Server to Client), or once authenticated would the XServe step out of the picture (NAS to Client)? Thinking about potential bottlenecks. I want to give these NAS's a second life.

3. Order of set-up. Just want to be sure i deploy it all the right way. Here is the order I was going to set it all up. Server Install & Update, DNS, Open Directory, Users/Worgroups, WebServices, XSAN, Final Cut Server. is that conceptually the right order to do it?

4. If i do all of this and I realize my little XServe is dying, how hard is it then to move services off the server onto another. I am most concerned with the Final Cut Svr activities becoming taxing when things get busy.

Anything else I am not thinking about? I actually have some everything except the RAID wired and up and running, been playing around with it before I wipe and start the actual deployment.

Thanks for the help!

1 reply

Sign in or join Beachball Help to reply.

  1. 0

    Apple Support Community member

    Imported from the Apple Support Forums via the Wayback Machine 🔗

    1. Is this too much to put on a single XServe.

    I don't think so. Given that you're implementing a SAN, the actual network load on the server seems to be pretty light. However it isn't clear to me what devices are actually running Final Cut services - the MacPro(s)? or the XServe?

    Apple recommend that you have a dedicated metadata controller. This isn't so much because running an MDC is heavy-duty, but more because it's sensitive to latency. In other words while you might be OK with lightweight tasks running on the MDC, you certainly don't want it to be running Final Cut or anything heavy.

    do you think I need to add a 4 port or larger NIC to the XServe and aggregate the links?

    No given the details so far, no. One port for XSAN, one for network traffic. Should be fine.

    2. How can I set up the server to serve the content from the NASs

    Once the NAS drives are mounted you can use Server Admin to re-share them using AFP.

    When accessing files on the NAS would the flow be (NAS to Server to Client), or once authenticated would the XServe step out of the picture (NAS to Client)?

    AFAIK, the Terastations don't support Open Directory, so network users cannot login to the NAS directly. They'd have to access through the server (i.e. client <-> server <-> NAS).
    Some Terastations (you don't specify which ones you have) support authentication against Active Directory, but not Open Directory.

    3. Order of set-up. Just want to be sure i deploy it all the right way. Here is the order I was going to set it all up. Server Install & Update, DNS, Open Directory, Users/Worgroups, WebServices, XSAN, Final Cut Server. is that conceptually the right order to do it?

    Given what you've said, it sound like XSAN and FCP are the primary tasks, therefore I wouldn't bother with the web server until the rest of the network is running. Web's pretty straightforward for the most part, so it won't add much time if you do decide to do it that way, but I'd focus on the things you need before the things you want.

    4. If i do all of this and I realize my little XServe is dying, how hard is it then to move services off the server onto another. I am most concerned with the Final Cut Svr activities becoming taxing when things get busy.

    This statement worries me since it implies you're using the XServe as a FCP node as well as the XSAN metadata controller. If that's the case then I'd look to get another machine ASAP.

    All of the services can be migrated from one machine to the other, but of them all I have least experience with XSAN, so I'd probably look to leave the MDC wherever it is rather than move it.